January 1905, No. 83 | The Railway and Shipping World (Toronto) | Page 9, col. 3 |
Railway development.
Projected lines, surveys, construction, betterments, etc.
...
British Columbia Electric Ry.—The contract for the construction of the additions to the buildings at the corner of Carroll and Hastings streets has been let to Crowe and Wilson. The lines in Vancouver and New Westminster, B.C., and the entire lighting system of the two cities are now being operated by power developed from the plant of the Vancouver Power Co., which is constructing a large plant at Coquitlam Lake and Trout Lake. The complete power system is expected to be in operation in the spring. (Dec., 1904, pg. 421.)
Railways: B.C.E.Ry.