December 1915, No. 214 Canadian Railway and Marine World (Toronto) Page 482, col. 2

Electric railway projects, construction, betterments, etc.

Lake Erie and Northern Ry.—We are officially advised that the electrical equipment of this line has been considerably delayed owing to the non delivery of the substation and car equipment by the manufacturer. A strong effort is being made to get the equipment installed so as to have the Galt-Brantford section in operation by Dec. 31. (Sept., pg. 356June, pg. 212.)

Railways: L.E. & N.Ry.

|<<<<<29303132333435363738>>>>>|

Results