Effective date changed by
17781
Rescinded by
19118

The Board of
Railway Commissioners for Canada.

Order no. 17552

Saturday, the 21st of
September, A.D. 1912
Re application of Cadwell Sand and Gravel Co., Ltd., of Windsor, Ont., complaining of increased rate on pressed brick from Bradford, Pennsylvania, to Windsor, Ontario, from $1.60 to $2 a ton.

Upon hearing the application at Toronto, on April 30, the applicants and the Canadian Freight Association being represented; and

upon its appearing that the G.T.R. will receive an additional 32¢ per ton as its proportion of the increased rate to $2 a ton—

it is ordered that the proportion, viz., 88¢ per ton, which accrued to the G.T.R. as its percentage division of the joint rate of $1.60 a ton charged from Bradford, Pa., to Windsor, Ont., prior to April 20, be restored by the G.T.R., within 45 days from the date of this order, as a proportional rate from Buffalo to Windsor, and as the maximum proportional to intermediate G.T.R. points, limited to brick shipped from Bradford and Bradford rate points destined to Windsor and the said intermediate points.