Station: | Oba | |
---|---|---|
Subdivision: | Oba | |
Mileage: | 109.3 | |
Symbols: | WY | |
Train Order: | DN | |
Office Signals: | BA | |
Sidings: | 229 | |
Other Tracks: | 131 | |
Location: | Oba (Algoma County) |
|
HSMBC Report: | RSR-153 | |
Designation / Year: | / |
The siding south of the main track is designated as South Siding. In event of the signal system (Rules 261 to 271) being declared inoperative by train order, Rule 5 will apply on South Siding.
The first siding north of the main track is designated as No. 1 Track. The second siding north of the main track is designated as No. 2 Track. When required to take siding, unless otherwise instructed by train Dispatcher, eastward freight trains will use No. 1 Track, and westward freight trains will use No. 2 Track.
Train inspection
Eastward freight trains. All cars on freigh trains must be given standing inspection on both sides by train crews. These instructions do not relieve conductors and trainmen from inspecting their train as prescribed by Rule 111, 4th para.
Date | Image | Notes |
---|---|---|
1941 | ![]() Gordon W. Powley / OA Image I0002832 |
Station |
1958-07 | ![]() CN Photo Collection / CSTM / Image 1102 |
West façade of station—ACR tracks to the north (left) and CNR tracks to the south (right). |
1992 | ![]() Murray Peterson photo |
CNR track side or south façade. |
1992 | ![]() Murray Peterson photo |
CNR track side or south façade. |
1992 | ![]() Murray Peterson photo |
ACR track side or north façade. |
1992 | ![]() Murray Peterson photo |
West façade. |
1992 | ![]() Murray Peterson photo |
Waiting room. |
Date | Reference | Railway | Subject | Description |
---|---|---|---|---|
1992 | RSR-153, Figure 5 | C.N.Rys. | Station. | Sketch; ground floor plan with approximate measurements. |
n.d. | RSR-153, Figure 11 | C.N.Rys. | Property plan. |