Udney

Station: Udney
Subdivision: Bala Orillia
Mileage: 77.5 0.0
Symbols: .. ...
Train Order: P ...
Office Signals: UY ...
Sidings: 66 ...
Other Tracks: 16 ...
Date Event
1910-07-28 C.N.O.Ry. authorized to carry freight over portion of its line from junction with its main line at Udney to Atherley, Ont., at speed not exceeding 10 miles an hourBRC Order 11308.
1914-03-01 Canadian Northern Ontario Ry.—It has been announced that the branch on the Toronto-Sudbury line from UhthoffUdney into Orillia, will be opened for traffic, Mar. 1.Canadian Northern Railway construction, betterments, etc., Canadian Railway and Marine World, March 1914, p. 126.
1914-06-12 C.N.O.Ry. authorized to open Orillia Subdivision for trafficB.R.C. Order 21993.
1923-01-31 G.T.Ry. becomes part of C.N.Rys.Bowers-1983, p. 162; Cooper-2001, p. 394.
1923c C.N.Rys. abandons Orillia Subdivision.
Date Reference Railway Subject Description
1907-02-06 NAC / Col. RG30M Acc. 78903/42 Item 286 CNOR Proposed standard station and dwelling No. 5. Plans, elevations, sections.
1907-05 NAC / Col. RG30M Acc. 78903/42 Item 287 CNOR Proposed standard station and dwelling No. 5. Door details.
1907-05 NAC / Col. RG30M Acc. 78903/42 Item 288 CNOR Proposed standard station and dwelling No. 5. Canopy and cornice details.
1907-06 NAC / Col. RG30M Acc. 78903/42 Item 289 CNOR Proposed standard station and dwelling No. 5. Window details.
1907-05 NAC / Col. RG30M Acc. 78903/42 Item 290 CNOR Proposed standard station and dwelling No. 5. Door and transom details.
1907-05 NAC / Col. RG30M Acc. 78903/42 Item 291 CNOR Proposed standard station and dwelling No. 5. Stair details.