History

Coming eventually...

Footnotes

No regular trains on this Subdivision.

Special Instructions No. 19 applicable.

Rules 41 and 44 applicable.

Speed restrictions Miles per hour
Trains 20

For further speed restrictions see page 17.

Engine and Car Restrictions
Heaviest engine permitted to operate, Mileage 1 to Deseronto 2500 and 2600 Class.
Heaviest auxiliary crane permitted 200 ton.

Chronology

Date Event
1911-10-28 CNOR authorized to open Belleville to Trenton for freight traffic[BRC Order 15211].
1912-02-13 CNOR authorized to open Deseronto to Belleville for freight traffic[BRC Order 15940].
1912-06-20 CNOR authorized to open Deseronto to Trenton for freight traffic[BRC Order 16721].
1923-09-30/1926-06-27 Appears as Ottawa Division/Deseronto Subdivision, Napanee to Brighton[CNR.CR.NOD.CHOD.3/17].
1926-09-26/1931-04-26 Appears as Deseronto Subdivision, Napanee to Brighton[CNR.CR.SOD.BD.1/19].
1931c CNR abandons Deseronto to Trenton.
1934-09-30 Appears as Deseronto Subdivision, Napanee to Deseronto and Trenton to Brighton[CNR.CR.SOD.BD.33].
1935c CNR abandons Trenton to Brighton.
1935-09-29/1938-04-24 Appears as Deseronto Branch, Napanee to Deseronto[CNR.CR.SOD.BD.37/44].
1940-09-29/1958-10-26 Appears as Deseronto Subdivision, Napanee to Deseronto[CNR.CR.SOD.BD.49/03].
1959-04-26/TBD Appears as Deseronto Spur, Napanee to Deseronto[CNR.CR.SOD.BD.04/TBD].
1986-10-10 CNR authorized to abandon Deseronto to Napanee[RTC Order No. R-39889]