| Station: | Hawthorne | |
|---|---|---|
| Subdivision: | Alexandria | |
| Mileage: | 129.95 | 0.0 |
| Symbols: | Z | |
| Train Order: | P | |
| Office Signals: | .. | |
| Sidings: | .. | |
| Other Tracks: | .. | |
Two leads to the New Yard Area have been constructed and are now ready for service. Both main track switches are connected with a pipe connected derail, which works in conjunction with the switch.